Case studies
Programmes where the ecosystem earns its keep.
Filter by the capability that led the engagement — or by the integrated programmes that needed all three SJAIN companies in the room.
WorkspaceGlobal Capability Centres
A 400-seat capability centre opened in under five months
Site selection, design, build and facility operations delivered end to end for a first India capability centre.
- Concept to occupancy
- 19 wksConcept to occupancy
- Seats delivered
- 400Seats delivered
- Accountable partner
- 1Accountable partner
WorkspaceProfessional Services
Three floors released without losing a single team
Occupancy data drove a hybrid workplace redesign that cut the footprint by a third and raised attendance.
- Footprint reduced
- 33%Footprint reduced
- Attendance uplift
- 21%Attendance uplift
- Floors occupied
- 6 → 4Floors occupied
Showing 1–2 of 2
Your programme